Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the polylang domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/sonarac1/domains/sonara-cm.cm/public_html/wp-includes/functions.php on line 6114
For Upgrading work on the 160 WB1 weighbridge from 50 to 60 tons (with modification of civil engineering, supply plus installation of an automatic weight printing device after weighting the trucks) and requalification work on transactional instruments by weighing of SONARA. – National Refining Company Limited (SONARA)

For Upgrading work on the 160 WB1 weighbridge from 50 to 60 tons (with modification of civil engineering, supply plus installation of an automatic weight printing device after weighting the trucks) and requalification work on transactional instruments by weighing of SONARA.

Pour les travaux d’upgrading du pont bascule 160 WB1 de 50 à 60 tonnes (avec modification du génie civil, fourniture plus installation d’un dispositif d’impression automatique du poids des camions) et des travaux de requalification des instruments transactionnels par pesée de la SONARA.
juin 16, 2022
Pour la fourniture de la soude caustique diluée à 50% à la SONARA
juin 17, 2022