Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the polylang domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/sonarac1/domains/sonara-cm.cm/public_html/wp-includes/functions.php on line 6114
Décision portant attribution d’attribution à l’entreprise MEGA Plus Engineers relatif à la fourniture de deux bras de chargement manuel PEROLO (4’’) par le dôme des camions citernes 2700x2300x2250 et des pièces de rechange (PDR) à la SONARADécision portant attribution d’attribution à l’entreprise MEGA Plus Engineers – National Refining Company Limited (SONARA)

Décision portant attribution d’attribution à l’entreprise MEGA Plus Engineers relatif à la fourniture de deux bras de chargement manuel PEROLO (4’’) par le dôme des camions citernes 2700x2300x2250 et des pièces de rechange (PDR) à la SONARADécision portant attribution d’attribution à l’entreprise MEGA Plus Engineers

Décision déclarant infructueux l’appel d’offres relatif à la fourniture d’un bras de chargement caboteurs manuel complet 8’’x10’’x46’’ construction à gauche – style 80 sorti à la SONARADécision déclarant infructueux l’appel d’offres
juillet 21, 2023
AOO aux travaux de remplacement d’une partie de la tuyauterie de la ligne de déballastage caboteurs
juillet 21, 2023