For cleaning of concrete areas outside customs enclosure and refinery buildings.
March 28, 2023
For the selection of an engineering company with a view to carrying out an in-depth technical-economic and financial study (Bankable Feasibility Study) and so-called feed studies (Front End Engineering and Design) for the reconstruction of units destroyed during the 31st may 2019 fire incident, and the finalization of the “SONARA 2010” project.
May 4, 2023